All asset protection projects are undertaken following a comprehensive risk assessment to ensure structured development of protection system or modifications in the existing system. During the pre-deployment evaluation; the focus areas are Planning, Engineering, and Testing (PET) to identify the gaps in design, integration and performance management. However, further recommendations are shared as the team on ground develops understanding of operational intricacies and opportunities for improvements are identified.

Planning includes all the actions identify:

Engineering is divided into three general areas:
Testing implies all the methods used to ensure that the protection is functioning as intended. These include but are not limited to: